Today it's possible to easily re-run a previous run. This is useful if you want to experiment with configuration changes between runs, to e.g. see the impact of certain constraint weight changes on the output of a plan. This request is to make it possible to take a run from Tenant A and re-run it in Tenant B (assuming the user has access to both tenants, with the right permissions, and the same model being available in both tenants). This would be useful to take e.g. planning problems from a production tenant (where user has viewer rights), and re-run them in a test tenant (where user has more rights), without the risk of using up resources of the production tenant.